Signing BOT Contract to Upgrade Highway 51
On December 11, 2009, BOT contract for construction investment project for expanding Highway 51 the Km0 +900 ÷ Km73+600 between the Department of Roads Vietnam and Development Corporation highway Bien Hoa – Vung Tau (BVEC) was signed.
Investment in construction projects to expand Highway 51, driven along Highway 51 line exists, the individual through the town of Long Thanh to the left under the existing line, designed for standard III delta road, speed level design Vtk = 80 km / h.
Typically cross section is 32.9 m wide, including: six lanes of motor vehicles, 2 lanes mixed strip and strip interface between safety and curb land.
Cross section of the road through the town of Long Thanh (Km16 +800 ÷ Km21 +700) is 37.9 m wide, including: six lanes of motor vehicles, 2 lanes mixed strip separates the strip interface between motor vehicles and rudimentary vehicle, range safety, curb land.
Cross section of the street through Bien Hoa City is 39.3 m wide, including: six lanes of motor vehicles, 2 lanes mixed strip and strip interface between safety, Summer Street.
Cross section of the street from Ba Ria-Vung Tau 22.5 m wide, including six lanes of motor vehicles and curb land. Structural concrete pavement with plastic on the macadam level coordination, ensuring strength pavement ÊÝÇ> 160 Mpa.
Building 10 bridges with extended load design H30 – XB80 and just 12 for the HL93 load design, scale cross-section of the bridge in accordance with the scale cross-section of the road. New construction for over 12 flyover bridges in densely populated areas.
The project has total investment 3313 billion, including capital contributed by investors accounting for 10%, commercial loans accounting for 90% of total investment.
The payback for the project through revenues toll-free at 1 – Long Thanh, Co May Bridge toll station after expiration of the BOT contract for Cloudy with a charge stations in My Xuan commune, district Tan Thanh, Ba Ria – Vung Tau.
Duration is a 24-year BOT contract, including construction period of 3 years from the date 02/8/2009.
Investment in construction projects to expand Highway 51 and Highway Project Bien Hoa – Vung Tau is delivered to the Government of investors including corporations investing in developing urban and industrial areas in Vietnam (IDICO ), Song Da Corporation and Bank for Investment and Development of Vietnam (BIDV) implementation.
This is a combination of investors and financial capacity and experience in implementing large projects, especially in transport, irrigation and hydropower, technical infrastructure …
Development Corporation highway Bien Hoa-Vung Tau (BVEC) is negotiating with investors BOT project construction investment expanded Highway 51 and Highway Project Bien Hoa-Vung Tau in Decision No. 485/QD-BGTVT date 04/3/2009.
On 02/8/2009, the construction of the project to expand Highway 51 has started. Package XL51-03 from the Km11 +000 ÷ +475 was rushing Km16 deployment. Currently, surveying, design, drawing on the whole line was completed.
Expected that construction will proceed by BVEC for all remaining packages on the 12/2009.
(Translated from Vietnamese Version on baotdautu.vn)